OBD GPS Tracker for Car Free 4G SIM | 15+ Features | Easy Plug & Play | Real-Time Location, Engine Health, Driving History, Fuel Consumption & Geofence Alerts
₹4,999.00 Original price was: ₹4,999.00.₹1,999.00Current price is: ₹1,999.00.
Price: ₹4,999 - ₹1,999.00
(as of Mar 09, 2026 05:44:16 UTC – Details)
Product Description






Package Includes: B20 OBD GPS Tracker (Plug & Play) with 1 Year of Doorsteps Replacement Warranty (no need to visit any service center), Android & iOS App, and 5G SIM Card (Inactive)(Subscription required).
Quick Support Contact us at +91-8440060609,contactus@fetaca.com, between 10 am – 7 pm on any day of the week for any assistance or inquiries. *OBD diagnostic data is subject to vehicle manufacturer specifications.*
Easy Plug & Play Installation: Plug into your car’s OBD port — no wiring or technical expertise required. Start tracking instantly with our user-friendly mobile app.
Accurate Real-Time Tracking: Monitor your vehicle’s live location 24/7 from anywhere in the world. Stay informed about your loved ones’ or fleet vehicles’ whereabouts at all times.
Detailed Driving History & Reports: Access comprehensive trip histories including routes taken, stop points, speed records, and more — ideal for monitoring driver behavior and fleet management.
Smart Geofence & Alerts: Create virtual boundaries and receive instant alerts when the vehicle enters or exits a defined area. Get notified for over-speeding, ignition on/off, or tampering attempts.
Compact & Discreet Design: Sleek, compact, and easily concealable, making it difficult to detect or remove without authorization.
Multi-Device App Support: Works seamlessly with Android and iOS devices with lifetime free tracking platform access and no monthly subscription required.